Protector Guardrail · D228.LB · 70°F · 15×30×8
L-Base
enquire about this configurationrotate model
Drag to rotate · click a component to identify it · right-click to isolate or hideDrag to rotate · tap a component to identify it · long-press for isolate and hide
Interactive 3D model of L-Base · foldable @ 70° · 15×30×8 stacked ballast tiles. Rotate with the arrow keys, zoom with the plus and minus keys, and press Escape to clear the selected part. The parts list on this page names every component and can select, isolate or hide it without the model.
drawing code
D228.LB.1500.NB
d228-lb-1500-15-30-08-d-70f
parts
38
assembly mass
88.2kg
enquiries
enquire about this configurationdownloads — no account needed
documents
- L-Base overviewPDF · 105 KB
- L-Base 1500 — technical drawingPDF · 1.3 MB
- L-Base temporary — technical drawingPDF · 496 KB
- L-Base 12 m — technical drawingPDF · 419 KB
- L-Base 12 m temporary — technical drawingPDF · 358 KB
3 declarations of performance set out the wind and imposed-load values for each ballast configuration, alongside the installation manual and the shared technical drawings.
specs
- drawing series
- L-Base (foldable @ 70°)
- module pitch
- 1500 mm
- angle
- 70°
- base type
- L-Base
- ballast tiles
- 15×30×8
- foldable
- yes
- stacked
- yes
- parts
- 38
- 7aluminium
- 10concrete
- 5plastic
- 14steel
- 2unspecified
L-Base configuration with a folding upright, ballasted on 15×30×8 tiles, stacked. One module weighs 88.2 kg and covers 1500 mm of edge — 58.8 kg per metre to carry up and lay out. Among the 40 configurations in this family it sits 18th by mass, between 36.9 and 177.5 kg; 10 ballast tiles are 81.8 kg of that, 93% of the assembly, lifted 8.2 kg at a time.
ballast and loading
Derived from this configuration's bill of materials — tile count and part mass as the payload states them, nothing assumed.
- ballast tilesD228.BT.15.30.08
- 10 × 15×30×8
- mass per tilehandled one tile at a time
- 8.2 kg
- ballast mass93% of assembly mass
- 81.8 kg
- assembly mass
- 88.2 kg
- mass per metre of edgeone 1500 mm module
- 58.8 kg/m
Bearing pressure is not published here: it needs the contact area of the feet and a load case, and the published data carries neither. Take the figures above to your structural engineer.
what this option costs
stacked ballast
This configuration carries 10 tiles where the unstacked L-Base · foldable @ 70° · 15×30×8 ballast tiles carries 5 — 40.9 kg more per module to lift onto the roof, for the same guardrail.
foldable post
The post folds down for seasonal roof access. Against the fixed L-Base · 70° upward · 15×30×8 stacked ballast tiles the published bill of materials is identical, so folding changes how the guardrail is handled, not what it weighs.
Folding and raising uses the Guardrail Deployment Tool (D228.GDT.1), which is a separate catalogue part and is not included in this configuration. deployment tool detail
otherL-Base configurations
40 configurations share this family — grouped by ballast tile size.
15×30×6 stacked
15×30×8 stacked
- 70° upward
- foldable @ 70°
- 90° upward
- foldable (flat @ 90°)
30×30×6 stacked
30×30×8 stacked
50×50×5 stacked
the assembly underneath
Every L-Base configuration is one stanchion assembly plus its ballast — the configurations differ in ballast and angle, not in the stanchion.
- rev-05 stanchion assemblyL-Base stanchion (PG-1500L)
- l-base rev-03 variationsstanchion variants — 70° vs 90° upward
talk to us about this configuration
Every drawing, part and figure on this site is published openly — no account, no gated download. Ask us about lead times, quantities for a run of edge, or anything the catalogue does not answer.
designed to protect, built to last
